Category
How long do I have to wait for a Grading Pre-Inspection to be completed?
A Grading Pre-Inspection normally takes two weeks, but it could be longer.
Want help getting started? Tap a topic below — or press the ? above for more examples.
Tap an example to try it. Ones with a highlighted address or permit number drop it into the box selected, so you can just type over it with your own before sending.
AI-generated answers about LADBS services. Verify important details at dbs.lacity.gov.
You are interacting with an AI-powered virtual assistant — not a human. It provides general information about Los Angeles Department of Building and Safety (LADBS) services based on available data.