What do I need to apply for Grading Pre-Inspection (GPI) Report?
You will need at least a plot plan to show the area of the propose grading and foundation work along with the cross-sections for the grading/foundation work.
Want help getting started? Tap a topic below — or press the ? above for more examples.
Tap an example to try it. Ones with a highlighted address or permit number drop it into the box selected, so you can just type over it with your own before sending.
AI-generated answers about LADBS services. Verify important details at dbs.lacity.gov.
You are interacting with an AI-powered virtual assistant — not a human. It provides general information about Los Angeles Department of Building and Safety (LADBS) services based on available data.