Residential / commercial scope
Both
A swimming pool may either be backfilled with structural compacted fill suitable for the support of footings, or left in place and backfilled with uncertified fill. In both cases, a grading permit is required.
Category
Pool & Spa
Plans required?
Yes
Where to go
ePlanLA
Over-the-counter?
No - Drafted plans will be reviewed for code compliance and required clearances will be confirmed before the permit is issued.
Likely clearances
Grading pre-inspection, if applicable
Residential vs commercial
Mechanical and electrical permits for pool removal may be required, when applicable (except 1-2 family dwellings).
Search keywords
pool removal, fill in pool, demolish pool, abandon, backfill, spa
Action button