Skip to main content
Displaying 111 - 120 of 139 results
Supplemental Correction Sheet for Stormwater SUSMP & SSMP (for 2011 Codes)
PC/STR/Corr.Lst.101-2010
Published:
       
Supplemental Plan Check Correction Sheet for Hillside Construction on Slopes Greater than 33 Percent (2023 LABC)
PC/STR/Corr.Lst.039-2023
Published:
       
30-Day Notification of Intent to Excavate
IB/P/BC 2026-060
Published:
Effective Date:
       
Guidelines for Determining Remedial Grading Exempted from the Baseline Hillside Ordinance
IB/P/BC 2023-139
Published:
Effective Date:
       
Wood Frame Prescriptive Provisions One Story Residential Construction Only
IB/P/BC 2026-004
Published:
Effective Date:
       
Foundation Design for Expansive Soils
IB/P/BC 2026-116
Published:
Effective Date:
       
Accessibility Details for Doors, Maneuvering Spaces and Routes
IB/P/BC 2026-086
Published:
Effective Date:
       
Fire Retardant Roof Coverings for Open Walking Decks and Space Roof Construction
IB/P/BC 2023-023
Published:
Effective Date:
       
Soils/Geology Report Reqs when Filing Parcel Map with City Planning
IB/P/BC 2026-132
Published:
Effective Date:
       
Minimum Info to be Shown on Grading Plans
IB/P/BC 2026-133
Published:
Effective Date: