How long will it take to get my report reviewed?

Regular: 5 to 6 weeks. Expedite: 4 to 5 weeks.

Published:
    Read FAQ
How much does it cost to have a report reviewed by the Grading Division?

Please refer to Department fee schedule online for general fees. Final fees to be determined at the time of submittal.

Published:
    Read FAQ
How the amount of the bond is calculated?

The bond is calculated based on the earthwork quantity, cost of drainage devices, and/or retaining walls per LABC 7006.5.7

Published:
    Read FAQ
What do I do if a slope failure occurs on my property or my neighbor's?

Contact the Training and Emergency Management Division (TEMD) at 311 or (213) 482-6788.

Published:
    Read FAQ
What do I do if my report is not approved?

Contact your consultant to provide a formal itemized response to the Department correction letter. Note: Additional Department fees are required for review.

Published:
    Read FAQ
What is required to develop in a seismic hazard zone?

Please refer to Information Bulletins P/BC 2014-044 and

Published:
    Read FAQ
What is the "Hillside Grading Area"?

Lands identified to be located within a Hillside Area based on the latest BOE Basic Grid Map A-13372, per Section 91.7003 of the Building Code. This map is on file in the official City documents located in the Office of the City Clerk in the Council File No. 121222 Sup. #1.

Published:
    Read FAQ
What is the "Hillside Ordinance Area"?

Land designated as “Hillside Area” on the Department of City Planning Hillside Area Map (12.21A.17), which can be viewed on NavigateLA. The area where construction projects are subject to the “Baseline Hillside Ordinance."

Published:
    Read FAQ
What is the Department procedure to obtain a drainage easement through a neighbor's lot?

Please see Information Bulletin P/BC 2026-057 for details.

Published:
    Read FAQ
When do I need a soils report?

A soils report is needed for construction on a slope steeper than 3:1 (Horizontal:Vertical), excavations removing lateral support, when a structure cannot be designed per building code values, and/or for structures which do not conform to chapter 18 of the 2014 LABC.

Published: