Skip to main content
Displaying 21 - 30 of 45 results
Will other agencies need to review my plans? Do other clearances still apply?

While the Pre-Approved Standard Plan Program streamlines the building and safety review process, other agency/departmental reviews and clearances may still be required depending on your specific site conditions and type of rebuild.

Published:
    Read FAQ
Who can I contact for general Zoning and Building Code questions related to SFDs?

For Zoning and Building code questions, please contact our call center at 311 or (213) 473-3231 and ask to speak with the LADBS Zoning & Building Code Engineer. Some zoning information can also be found on ZIMAS.

Published:
    Read FAQ
What does "like-for-like" mean, exactly?

A project may be rebuilt with the same nonconforming use, yards, height, number of stories, lot area, foot print, floor area, residential floor area, residential density, or parking as the structure that existed or had a valid permit immediately before the Wildfire.

Published:
    Read FAQ
What does "substantially the same location" mean? How much can my new home move within my lot?

The proposed building shall be located within a maximum offset of the existing building footprint. The allowable offset shall be a maximum of 20% of the lot width and 20% of the lot depth, in the same direction as the lot width or depth, respectively.

Published:
    Read FAQ
Can projects with a basement still qualify as a like-for-like project?

Adding a new basement or enlarging an existing basement level is allowed and qualifies as an Eligible Project, provided the basement does not exceed 110% of the existing building footprint.

Published:
    Read FAQ
Can I expand my second story?

A second story that existed prior to the wildfire may be rebuilt and expanded as part of a like-for-like +10% project, so long as it complies with maximum allowable height and building footprint. 

Published:
    Read FAQ
How are "prevailing setbacks" determined?

Prevailing setbacks apply to areas with developed lots (where some homes burned down, and with some homes still standing) of varying front yard setbacks.  See

Published:
    Read FAQ
Is my rebuild project required to have rooftop solar panels?

Under the Governor's Executive Order N-29-25 issued on July 7, 2025, solar pv systems are not required.

Published:
    Read FAQ
Does my rebuild project need to comply with the current Energy Code?

Yes, the current Energy Code applies. 

Published:
    Read FAQ
Are surveys required?

Yes, surveys are required if the property lines are not clear or cannot be established in the field.

Published:
    Read FAQ