Skip to main content
Displaying 31 - 40 of 45 results
Are Geology and Soils reports required?

Geology and Soils reports are required in some geologically sensitive areas as outlined in the Information Bulletin P/BC 2025-157 Geologic and Geotechnical Considerations for Rebuilding in the Palisades Fire Area.

Published:
    Read FAQ
Is a slope-band analysis required?

A slope band analysis is not required if rebuilding as a like-for-like +10% project. Otherwise, projects within a designated hillside area will require a slope band analysis.

Published:
    Read FAQ
Can I rebuild my attached or detached garage? Does it count as part of my 110%?

Yes you can rebuild your attached or detached garage as part of a like-for-like+10% project. Each detached structure will be evaluated individually for conformance with like-for-like requirements.

Published:
    Read FAQ
Can I build back with gas appliances or does my new home have to be all-electric?

Yes, you may choose whether to build back all-electric and/or with gas appliances.

Published:
    Read FAQ
Do I have to pay building permit fees for my like for like rebuild?

Under the Mayor's Emergency Executive Order 7, the collection

Published:
    Read FAQ
Do I need to pay school fees and affordable housing linkage fees if I am building back a like-for-like Eligible Project? What if I am building back a project that is bigger than like-for-like?

Linkage Fee will not apply for the replacement of the existing house resulting in the net increase of 1500 sqft or less of floor area from the prior home that existed on the property. School District fees will not apply if the replacement house is built with the same square footage.

Published:
    Read FAQ
What information sources will the City use to determine what existed on my lot before the fire? What if there is different information in my old building permits compared to other sources such as the County Assessor?

Acceptable records shall include building permits, Certificate of Occupancy, County Assessor, and Coastal Commission. On a case by case basis, the Department may consider other photographic sources such as Google Maps and LiDAR.

Published:
    Read FAQ
What is the timeline for DBS to review a plan and issue a permit?

Under the Mayor’s Emergency Executive Order #1, DBS and other City departments will complete their initial reviews for building permits within 30 days. However, DBS has so far been able to complete the review within 10 days.

Published:
    Read FAQ
How will the foundation be established for the rebuild after it is removed?

If the foundation was removed, LADBS would use available records to establish where the footprint of the foundation was originally. Please see question above regarding what records LADBS will use to establish what was on a site prior to the wildfire.

Published:
    Read FAQ
Will the removal of the foundation/footing impact the 30 day expedited construction permit?

LADBS will expedite review of all rebuild projects. 

Published:
    Read FAQ