Skip to main content
Displaying 671 - 680 of 718 results
How much will the permitting fees be when I decide to move forward with a Pre-Approved Standard Plan?

Architects, Engineers, Designers and Builders are responsible for paying the necessary plan check and permit fees required to have their designs reviewed and pre-approved for inclusion in the Standard Plan Pilot Program.

 

Published:
    Read FAQ
What items are required for plan check submission using an SFD Pre-Approved Standard Plan?

For a complete listing of building permit submittal requirements, please refer to the Building Permit Checklist.

Published:
    Read FAQ
Once a standard plan is selected, how does a customer indicate the use of the standard plan on the LADBS permit application?

When submitting your Building Permit application, please indicate the SFD Standard Plan number you are using in the work description.

Published:
    Read FAQ
To what extent can homeowners customize their standard plan designs?

Standard plans are intended to serve as a base design that has already been reviewed by the Department of Building and Safety for Building Code Compliance. However, each property is unique, and modifications / customizations to a pre-approved standard plan may be necessary.

Published:
    Read FAQ
Will other agencies need to review my plans? Do other clearances still apply?

While the Pre-Approved Standard Plan Program streamlines the building and safety review process, other agency/departmental reviews and clearances may still be required depending on your specific site conditions and type of rebuild.

Published:
    Read FAQ
Who can I contact for general Zoning and Building Code questions related to SFDs?

For Zoning and Building code questions, please contact our call center at 311 or (213) 473-3231 and ask to speak with the LADBS Zoning & Building Code Engineer. Some zoning information can also be found on ZIMAS.

Published:
    Read FAQ
What does "like-for-like" mean, exactly?

A project may be rebuilt with the same nonconforming use, yards, height, number of stories, lot area, foot print, floor area, residential floor area, residential density, or parking as the structure that existed or had a valid permit immediately before the Wildfire.

Published:
    Read FAQ
What does "substantially the same location" mean? How much can my new home move within my lot?

The proposed building shall be located within a maximum offset of the existing building footprint. The allowable offset shall be a maximum of 20% of the lot width and 20% of the lot depth, in the same direction as the lot width or depth, respectively.

Published:
    Read FAQ
Can projects with a basement still qualify as a like-for-like project?

Adding a new basement or enlarging an existing basement level is allowed and qualifies as an Eligible Project, provided the basement does not exceed 110% of the existing building footprint.

Published:
    Read FAQ
Can I expand my second story?

A second story that existed prior to the wildfire may be rebuilt and expanded as part of a like-for-like +10% project, so long as it complies with maximum allowable height and building footprint. 

Published:
    Read FAQ