What information sources will the City use to determine what existed on my lot before the fire? What if there is different information in my old building permits compared to other sources such as the County Assessor?

Acceptable records shall include building permits, Certificate of Occupancy, County Assessor, and Coastal Commission. On a case by case basis, the Department may consider other photographic sources such as Google Maps and LiDAR.

Published:
    Read FAQ
What is the timeline for DBS to review a plan and issue a permit?

Under the Mayor’s Emergency Executive Order #1, DBS and other City departments will complete their initial reviews for building permits within 30 days. However, DBS has so far been able to complete the review within 10 days.

Published:
    Read FAQ
How will the foundation be established for the rebuild after it is removed?

If the foundation was removed, LADBS would use available records to establish where the footprint of the foundation was originally. Please see question above regarding what records LADBS will use to establish what was on a site prior to the wildfire.

Published:
    Read FAQ
Will the removal of the foundation/footing impact the 30 day expedited construction permit?

LADBS will expedite review of all rebuild projects. 

Published:
    Read FAQ
How will LADBS review my project if I cannot find copies of my original building plans, including plans for my foundation?

LADBS would use available records to establish what was on a site prior to the wildfire. New building plans would then need to be prepared and submitted to the Department for review.

Published:
    Read FAQ
Can I build a new ADU as part of my rebuild project? Can the ADU be built before the main house?

Yes, a new ADU can be built as part of the rebuild and still qualify as a like-for-like +10% project per the Governor's Directive No. N-20-25, regardless of  whether or not an ADU existed on the site prior to the Wildfire.

Published:
    Read FAQ
What projections are allowed to the building’s footprint and height and still be considered as an Eligible Project?

Eaves: Project into the required side yard not more than 4 inches for each foot of width of such side yard, provided the width of the side yard is not reduced to less than 30 inches. Project into the required front and rear yards not more than 30 inches.

Published:
    Read FAQ
Can I add an ADU on the second floor of my house or on the second floor of my detached garage and be considered as like-for-like?

The ADU can be added on the second floor as long as the overall resulting building height is within 110% of the existing building height.

Published:
    Read FAQ
What is the Pacific Palisades Undergrounding Initiative? What are the requirements for future-ready electrical service?

Please refer to LADWP Pacific Palisades Undergrounding Initiative, which provides more information, along with the requirements and steps for electric service installation.

Published:
    Read FAQ
Are all plans for prefabricated or modular structures?

No. The Standard Plan program includes pre-approved designs that are both meant to be built in place as well as designs that are prefabricated off-site.