Skip to main content
Displaying 541 - 550 of 1166 results
Do I need a soils report for a subdivision?

A soils/geology report for a subdivision is generally required in hillside areas and seismic hazard zones. See Information Bulletin P/BC 2023-132.

Published:
    Read FAQ
Do you review methane reports?

No. Methane reports are reviewed by the building plan checker. See Chapter 71 of the LABC.

Published:
    Read FAQ
How can I find out if my property is in a seismic hazard zone?

Check the Parcel Profile Report available on the Department’s website. NavigateLA also shows the extent of seismic hazard zones colored in the map.

Published:
    Read FAQ
How can I report an unpermitted grading/construction?
Published:
    Read FAQ
How do I find out if a previous soils/geology report was submitted for my property?

Check the “Search Online Building Records” on the Department’s website. Previous soils/geology reports can also be obtained at the Records Section locations at 201 N. Figueroa Street, Rm.

Published:
    Read FAQ
How do I obtain previous soils/geology reports?

Check the “Search Online Building Records” on the Department’s web site. Previous soils/geology reports can also be obtained at the Records Section locations at 201 N. Figueroa Street, Rm.

Published:
    Read FAQ
How do I submit a report to the Grading Division?

Reports must be submitted in person at any construction services center.

Published:
    Read FAQ
How long is a soils/geology report good for?

In general, four years, unless there is a change in the scope of work or adoption of a new LABC.

Published:
    Read FAQ
How long will it take to get my report reviewed?

Regular: 5 to 6 weeks. Expedite: 4 to 5 weeks.

Published:
    Read FAQ
How much does it cost to have a report reviewed by the Grading Division?

Please refer to Department fee schedule online for general fees. Final fees to be determined at the time of submittal.

Published:
    Read FAQ