Skip to main content
Displaying 571 - 580 of 1126 results
Where can I obtain a copy of the Green Building Code?

CALGreen and Los Angeles Green Building Codes are available to view on our website.

Published:
    Read FAQ
Who can prepare a commissioning report?

The report can be prepared by commissioning agents and any other trained personnel with experience on projects of comparable size and complexity.

Published:
    Read FAQ
Can I combine a kitchen exhaust with a bathroom exhaust?

Kitchen exhaust with intake from the kitchen ceiling register and bathroom exhaust can be combined using the same exhaust duct. Kitchen exhaust firm a kitchen hood shall be combined with bathroom exhaust.

Published:
    Read FAQ
Can I install a residential hood in a non-dwelling unit?

Yes, but with conditions. Residential hoods may be installed in employee kitchen areas, community centers in residential buildings, churches and similar areas that are not designed for the selling of food to the public.

Published:
    Read FAQ
Can the bathroom, kitchen and dryer exhaust terminate under the balcony?

Yes, but with conditions. Contact Mechanical Plan Check for more information.

Published:
    Read FAQ
Do I need plan check to install an air conditioning system in a single dwelling?

Plan check is required when the aggregate cooling or the heating in the building exceeds 500,000 BTU/hr.

Published:
    Read FAQ
Do I have to install a hood in a residential kitchen?

A hood is not required for residential kitchens. However, it is required to provide kitchen ventilation for removing moisture.

Published:
    Read FAQ
Do I need plan check to install window AC units?

No, plan check is not required for ductless window units.

Published:
    Read FAQ
I am installing a new air conditioning system, what type of filters do I need to use?

Residential buildings up to 3 stories in height shall have filters with Minimum Efficiency Reporting Value (MERV) of 6. Residential buildings over 3 stories in height have no requirements for MERV values. All non-residential buildings shall have filters with a MERV rating of at least 8.

Published:
    Read FAQ
I am replacing or adding an AC unit. Do I need to prepare plans?

If the AC units that are added or replaced add up to 5 or more, then plans must be prepared and submitted for approval to Mechanical Plan Check.

Published:
    Read FAQ