Skip to main content
Displaying 871 - 880 of 920 results
Is my rebuild project required to have rooftop solar panels?

Under the Governor's Executive Order N-29-25 issued on July 7, 2025, solar pv systems are not required.

Published:
    Read FAQ
Does my rebuild project need to comply with the current Energy Code?

Yes, the current Energy Code applies. 

Published:
    Read FAQ
Are surveys required?

Yes, surveys are required if the property lines are not clear or cannot be established in the field.

Published:
    Read FAQ
Are Geology and Soils reports required?

Geology and Soils reports are required in some geologically sensitive areas as outlined in the Information Bulletin P/BC 2025-157 Geologic and Geotechnical Considerations for Rebuilding in the Palisades Fire Area.

Published:
    Read FAQ
Is a slope-band analysis required?

A slope band analysis is not required if rebuilding as a like-for-like +10% project. Otherwise, projects within a designated hillside area will require a slope band analysis.

Published:
    Read FAQ
Can I rebuild my attached or detached garage? Does it count as part of my 110%?

Yes you can rebuild your attached or detached garage as part of a like-for-like+10% project. Each detached structure will be evaluated individually for conformance with like-for-like requirements.

Published:
    Read FAQ
Can I build back with gas appliances or does my new home have to be all-electric?

Yes, you may choose whether to build back all-electric and/or with gas appliances.

Published:
    Read FAQ
Do I have to pay building permit fees for my like for like rebuild?

Under the Mayor's Emergency Executive Order 7, the collection

Published:
    Read FAQ
Do I need to pay school fees and affordable housing linkage fees if I am building back a like-for-like Eligible Project? What if I am building back a project that is bigger than like-for-like?

Linkage Fee will not apply for the replacement of the existing house resulting in the net increase of 1500 sqft or less of floor area from the prior home that existed on the property. School District fees will not apply if the replacement house is built with the same square footage.

Published:
    Read FAQ
What information sources will the City use to determine what existed on my lot before the fire? What if there is different information in my old building permits compared to other sources such as the County Assessor?

Acceptable records shall include building permits, Certificate of Occupancy, County Assessor, and Coastal Commission. On a case by case basis, the Department may consider other photographic sources such as Google Maps and LiDAR.

Published:
    Read FAQ