Skip to main content
Displaying 191 - 200 of 390 results
Good Neighbor Construction Practices
Published:
       
Palisades Geohazard Risk Assessment Zones (PGRAZ)
Published:
       
Compaction, Soils and Geological Reports for Rebuilding in the Palisades Fire Area
IB/P/BC 2026-157
Published:
Effective Date:
       
Emergency Executive Order No. 1 Implementation Guidelines
Published:
       
Emergency Executive Order No. 4 Implementation Guidelines
Published:
       
What projections are allowed to the building’s footprint and height and still be considered as an Eligible Project?

Eaves: Project into the required side yard not more than 4 inches for each foot of width of such side yard, provided the width of the side yard is not reduced to less than 30 inches. Project into the required front and rear yards not more than 30 inches.

Published:
    Read FAQ
Can I add an ADU on the second floor of my house or on the second floor of my detached garage and be considered as like-for-like?

The ADU can be added on the second floor as long as the overall resulting building height is within 110% of the existing building height.

Published:
    Read FAQ
LADWP Pacific Palisades Undergrounding Initiative - Property Owner & Contractor Requirements for Future-Ready Electrical Service
Published:
       
What is the Pacific Palisades Undergrounding Initiative? What are the requirements for future-ready electrical service?

Please refer to LADWP Pacific Palisades Undergrounding Initiative, which provides more information, along with the requirements and steps for electric service installation.

Published:
    Read FAQ
Modern Design Engineering-SFH 011
Published:
    Read More