Skip to main content
Displaying 161 - 170 of 223 results
April 2022 Newsletter
Published:
       
January 2022 Newsletter
Published:
       
Benchmark Compliance Instructions Coversheet
Published:
       
Hector Ochoa

Commissioner Ochoa became a member of the Disabled Access Appeals Commission in January 2025. Born with Osteogenesis Imperfecta and a wheelchair and hearing aid user from an early age, Mr. Ochoa brings a wealth of lived experience and professional experience to this commission.

Published:
    Read FAQ
Career Opportunities
Published:
    Read More  
Wildfire Plan Submittal Checklist
IB/P/GI 2026-036
Published:
Effective Date:
       
ERW Design
Published:
    Read More  
Wildfire Plan Submittal Requirements Checklist
Published:
       
What does "like-for-like" mean, exactly?

A project may be rebuilt with the same nonconforming use, yards, height, number of stories, lot area, foot print, floor area, residential floor area, residential density, or parking as the structure that existed or had a valid permit immediately before the Wildfire.

Published:
    Read FAQ
What does "substantially the same location" mean? How much can my new home move within my lot?

The proposed building shall be located within a maximum offset of the existing building footprint. The allowable offset shall be a maximum of 20% of the lot width and 20% of the lot depth, in the same direction as the lot width or depth, respectively.

Published:
    Read FAQ