Skip to main content
Displaying 2691 - 2700 of 4675 results
Why must I have a sump pump?

The Department requires the use of a sump pump when concentrated drainage cannot be directed to an approved location via gravity.

Published:
    Read FAQ
Can the electric vehicle (EV) charging infrastructure provided at a disabled parking stall be used to satisfy the Green Building requirements?

No, EV charging stalls are required to be unrestricted and available for all users. However, if the EV charging infrastructure is located in a manner where it can facilitate both spaces, then it will be acceptable.

Published:
    Read FAQ
Does the Green code apply to my project?

Green Building code is applicable to the following projects:

  • New buildings
  • Additions of any size
  • Alter/Repair with a valuation of $200,000 or more
  • Alterations to residential buildings that result in increase in conditioned volume.
Published:
    Read FAQ
Does the number of stories of a building affect the designation of a building from a residential to a non-residential project?

No, the number of stories does not change the requirements of a residential or non-residential use.

Published:
    Read FAQ
How can I obtain Green Building approval?

Contact the designated plan checker on your project to make an appointment for verification of corrections. Contact information is provided on the correction sheet. Approval for Green Building requirements will be provided after verification of all corrections is completed.

Published:
    Read FAQ
How do I submit plans for Green Building Plan Check?

During the regular plan check submittal process, an additional set of plans is collected and routed for Green Building section for review and approval process, if required.

Published:
    Read FAQ
Is a hotel a residential or non-residential project?

Guest rooms in a hotel for sleeping purposes and any related use is considered a residential project.

Published:
    Read FAQ
When do I need to call for green inspection?

Call for initial inspection after HVAC is installed and ducts sealed and prior to drywall installation.

Published:
    Read FAQ
When is a commissioning report required?

Commissioning report is required for all new non-residential projects of 10,000 square feet or more. The exceptions are warehouses, open parking garages and similar projects.

Published:
    Read FAQ
When is it required to have the ducts covered during a project?

Ducts should be covered as soon as installed, and shall remain covered until the HVAC system is installed and ready to be turned on.

Published:
    Read FAQ