Skip to main content
Displaying 2831 - 2840 of 4675 results
When do I need to apply for a Sign Pre-Inspection (SPI)?

Most of the signs except wall signs, under certain conditions, require a Sign Pre-Inspection (SPI) report. See the Information Bulletin P/BC 2014-078 for more information.

Published:
    Read FAQ
When should I call for inspection?

A permit is good for two years from the time the permit fees are paid. You will need to call for inspection at least once every 12 months, or the permit expires.

Published:
    Read FAQ
Where can I find the affidavit forms?

The forms are available on LADBS.ORG. Please see our Covenant and Agreements forms.

Published:
    Read FAQ
Where can I park?

You cannot park within the required front yard setback of a property.

Published:
    Read FAQ
Formaldehyde Emissions Verification Checklist (for 2011 Codes)
GRN 3-2011
Published:
       
Mandatory Requirements Checklist Additions and Alterations to Residential Buildings of Six Stories Or Less (for 2011 Codes)
GRN 9-2013
Published:
       
Mandatory Requirements Checklist Additions and Alterations to Non-Residential Buildings and Residential Buildings Over Six Stories (for 2011 Codes)
GRN 10-2013
Published:
       
Green Building Certification (for 2011 Codes)
GRN 12-2011
Published:
       
Owner's Project Requirements (OPR) (for 2011 Codes)
GRN 20-2013
Published:
       
Functional Performance Testing (for 2011 Codes)
GRN 24-2011
Published: