Skip to main content
Displaying 2511 - 2520 of 4675 results
Accessory Dwelling Unit (ADU)
Published:
    Read More  
What type of permit is required?

A permit is required for Demolition, New Building, Addition, and Alteration.

Published:
    Read FAQ
What work does not require a permit?

Work that is less than $500.00 in valuation.

Published:
    Read FAQ
What zone is this permit located in?

There is a section on the permit that indicates geographical indicators. The zone is located there.

Published:
    Read FAQ
When are the compliance dates for the Order to Comply?

The compliance dates vary the same date of issuance or 15 days later.

Published:
    Read FAQ
When is an Air Quality Management District (AQMD) clearance letter required?

An AQMD clearance letter is required whenever there is a "Yes" answer to any of the questions on the AQMD "Air Quality Permit Checklist". The AQMD clearance letter will be required before a Certificate of Occupancy is issued. For more information, please call 1-800-CUT-SMOG.

Published:
    Read FAQ
When is an Architects & Engineer Certificate of Compliance required?

Projects that utilizes higher stresses require the Architect or Engineer to submit the form.

Published:
    Read FAQ
When is a building verification required?

Building verification is required after all other division clearances have been obtained.

Published:
    Read FAQ
When is a Carpet Sound Certificate required?

In apartment buildings, when carpet is installed in an assembly meeting the STC 50 requirement.

Published:
    Read FAQ
When is a Certificate of Occupancy required?

A Certificate of Occupancy is required for new buildings, additions, change of use or occupancy.

Published:
    Read FAQ