Skip to main content
Displaying 2531 - 2540 of 4675 results
When is a Plumbing Verification required?

When clearance for the plumbing is required.

Published:
    Read FAQ
When is a Reroof Certificate required?

A reroof certificate is required for existing building in which the roof is replaced or repaired.

Published:
    Read FAQ
When is a roof nailing inspection required?

When all rough sheathing is in place and nailed.

Published:
    Read FAQ
When is a rough inspection required?

When all framing is in place and electrical and plumbing installed.

Published:
    Read FAQ
When is a seismic gas valve required?

If the project has gas and the valuation is over $10,000.00.

Published:
    Read FAQ
When is a smoke detector inspection required?

Smoke detectors are required in all residential buildings

Published:
    Read FAQ
When is a Stormwater Observation Report required?

When required by Department of Public Works Sanitation. Please contact the Department of Public Works for more information. 

Published:
    Read FAQ
When is a Structural Observation required?

When required by the provisions of section 1710.2 or 1710.3 of the LAMC.

Published:
    Read FAQ
When is a T-bar ceiling inspection required?

When all HVAC, electrical, and fire sprinkler are installed in the ceiling, but before covering.

Published:
    Read FAQ
When is an AQMD clearance required?

An AQMD clearance is required for charbroilers spray booth, dry cleaning, motor fuel storage, ETC.

Published:
    Read FAQ