Skip to main content
Displaying 2561 - 2570 of 4675 results
Where can I find the application for renewal, new general approval, technical modifications, and one-time approval from the Mechanical Test Lab?

All testlab applications are listed on the Mechanical Test Lab page on the LADBS website.

Published:
    Read FAQ
Are there exceptions to the requirement of "graywater ready" systems?

Yes. Graywater Ready Systems are not required when the landscape area on the site does not exceed 500 square feet, or when graywater irrigation is not permitted due to geological conditions, or for additions or alterations that use the existing building drain.

Published:
    Read FAQ
Can I combine emergency drains with subsoil drainage system?

Yes. However, the emergency drains shall be protected against backflow with backwater valves.

Published:
    Read FAQ
Can I discharge water from the sprinkler piping to the storm drain system?

No, water from sprinkler drain shall discharge to the sewer.

Published:
    Read FAQ
Can I get plan check approval before getting the gas service letter from the gas company?

No. Low pressure gas systems (2 psi or less) with more than 10 gas outlets require plan check. Medium and high pressure gas systems (more than 2 psi) require plan check regardless of the number of gas outlets.

Published:
    Read FAQ
Can I install a water heater in the yard?

The Plumbing Code allows outdoor installations of water heaters. Check with the Zoning engineer for required minimum distance from the property line.

Published:
    Read FAQ
Can I use a slope of less than 1% for rain water piping?

No, since the pipe sizing tables for rain rainwater are based on a minimum 1% slope.

Published:
    Read FAQ
Can I use ABS pipe in a residential building?

Plastic waste and vent piping in residential occupancies are allowed when the residential portion of the building is 2 stories or less.

Published:
    Read FAQ
What are the over-the-counter hours for Mechanical Plan Check?
  • Monday 7:30 AM - 4:30 PM
  • Tuesday 7:30 AM - 4:30 PM
  • Wednesday 9:00 AM - 4:30 PM
  • Thursday 7:30 AM - 4:30 PM
  • Friday 7:30 AM - 4:30 PM
  • Monday 7:30 AM - 4:30 PM
  • Tuesday 7:30 AM - 4:30 PM
  • Wednesday 9:00
Published:
    Read FAQ
Do I need plan check if I am adding plumbing fixtures in an existing building that has a main pipe 2 inches diameter or larger?

Plan check is not required for existing systems that are added added or altered with branch lines serving less than 20 fixture units and sized per table 610.4.

Published:
    Read FAQ